Tuesday, November 06, 2007

Our latest concrete project

Of course, despite the November date and Thanksgiving fast approaching, we have decided to add another project to our "get done before frost" list. We are in the process of repairing our front step. The prior owners at some point patched the front step. However, they did not do it right-opting for quickness/ease over longevity. As a result, last year, the patched piece finally gave way.



This time around, Glenn used rebar. This past weekend, he drilled holes in the step, glued in rebar cut to fit, then wired the rebar together.



The epoxy takes 24 hours to dry, so we had to wait until this coming weekend to pour the concrete into a form (to be made). We can pour concrete as long as it is 40 degrees (and not currently raining). We are hoping that this weekend that will be the case.